Install the roofing screws vertically along each rib in the panel.
Shingle roof ridge installation.
Install new flashing metal.
Start by removing the nails holding the ridge cap shingles in place.
5install metal panels or shingles.
Ensure the shingles aren t too cold.
There are a number of key steps you need to take to avoid mucking this part up.
Overlap each row at least 3 to 4 inches.
Step 5 install roof ridge shingles.
Gaf ridge cap intersections.
Line up the edges with the chalk line and secure with 2 roof nails right above the adhesive line on the shingle tab.
This is an area of the roof which requires extra care and skill.
Insert a flat pry bar under the shingle cap and lift up on both the shingle and the nail head to loosen the nail then pry out the nail.
Since ridge cap shingles have to be formed over the ridge the shingles.
Quick installation tips for how to install gaf hip ridge cap shingles on a roof.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Start by laying asphalt felt or other underlayment over the roof.
Using your staple gun secure the felt to the roof.
Detail installation video of ridge cap shingles at intersections of the hip and ridge.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Continue along the ridge of the roof until you have all of the shingles secured.
The shingle should be in the center of the ridge.
Gaf ridge cap transitions.
Chalk lines should be used to help ensure clean straight professional looking shingle ridge cap installation.
For most asphalt shingle ridge caps there are two nails in each ridge cap one on either side of the ridge.
To finish a shingle ridge cap you should set.